Infrastruction
Powering Precision Through Infrastructure
At Austenite Metalworx Pvt Ltd, our infrastructure is the foundation of our commitment to precision, performance, and reliability. Located in Pune, one of India’s premier manufacturing hubs, our facility is designed to meet the demanding needs of industries such as automotive, aerospace, oil & gas, defence, and railways.
From hot forging to die manufacturing, every corner of our facility is built to deliver consistent quality, operational efficiency, and scalable production.
Facility Overview
Location
Strategically located in Pune, India – close to key industrial corridors and logistics routes.
Facility Size
4500 sq. ft. leased industrial shed with space designed for phased expansion.
Infrastructure Built for Scale
From our current setup with a 1000 Tonne mechanical press to future expansions involving up to 1600 Tonne presses – our facility is geared for high-volume, high-precision forging.
Installed Equipment & Capabilities
Mechanical Press – 1000 Tonne
High-capacity press for large and complex forged components
Integrated with trimming press and induction heater
In-House Forging Die Design & Manufacturing
Full control over die quality, fit, and finish
Enables product customization and rapid prototyping
Additional Equipments
Trimming Press
Induction Heating Systems
Material Handling Equipment
Tool Room for Die Maintenance
Growth Strategy
Planned Expansion Roadmap
Year 1
Initial Expansion
Target Production: Increase from 600 tonnes to 1800 tonnes per year
Planned Investment: Procurement of a second 1000 Tonne hydraulic forging press with all supporting accessories
Year 3
Growth Acceleration
Target Production: 3000 tonnes per year
Planned Investment: Installation of a third 1000 Tonne press with enhanced automation and material handling capabilities
Year 5
Major Capacity Boost
Target Production: 4200 tonnes per year
Planned Investment: Commissioning of a 1600 Tonne hydraulic press, supporting infrastructure, and advanced quality control systems





